Pricing

Priced per circuit. Justified per tonne.

Circuit, Concentrator and Enterprise. The Circuit tier covers one control or sensing module on one grinding or flotation circuit. Concentrator covers the whole plant. Enterprise is for multi-site mining groups. Annual prepay carries a 15 to 20% discount and outcome components are available on recovery, energy, water and reagents.

Circuit · $20,000 per circuit / monthConcentrator · $130,000 / monthEnterprise · $900k to $12M ACV

Packaging logic

Land, expand, monetise the value

  1. Land. Low-friction entry on one circuit with a clear ROI metric, on the Circuit tier.
  2. Expand. Circuits, areas, concentrators, sites and autonomy level, into Concentrator and Enterprise.
  3. Monetise value. Usage and outcome pricing on recovery, energy, water and reagents capture upside as the agent does more of the work. A recovery point is worth a great deal of metal.

Floor pricing is protected. Discounts are traded for term length and a published case study.

Pricing

Priced per circuit, per plant, per group

Land on one workflow with a measured baseline. Expand by circuit, area, concentrator and autonomy level. Outcome components are available on recovery, energy, water and reagents. Annual prepay carries a 15 to 20% discount.

Billing period
Circuit $20,000 per grinding or flotation circuit / month · billed monthly

Comminution or flotation control, or grade sensing, for one circuit. For concentrators validating ROI on the wedge.

  • One circuit, one agent module
  • Plant-edge inference node included
  • APC, DCS and sensor reads, guarded writes
  • Run log, audit trail, lot genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $900k to $12M ACV

Multi-site mining groups standardising on Orebex, with custom ore, mineralogy and recovery models.

  • Multi-site fleet management
  • Custom ore, mineralogy and recovery models
  • Plant edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Compare

What is in each tier

Products are licensed per circuit on the Circuit tier and bundled on Concentrator and Enterprise.

What is in each tier
CapabilityCircuitConcentratorEnterprise
Circuits covered1All on siteAll in group
Agent modules1 of 5 productsAll agentsAll agents + custom models
As-run twin (Oretwin)NoIncludedCustom site twins
Whole-plant optimisation (Recovex)NoIncludedIncluded + benchmarks
Plant-edge nodeIncludedPer circuitFleet managed
Guarded APC and DCS writesScoped tagsAll scoped tagsGroup policy
Lot genealogy and environmental recordIncludedIncludedIncluded + assurance packages
Autonomy levelsL1 to L2L1 to L3L1 to L4 when characterised
SSO and RBACNoPlannedPlanned, with approval chains
On-prem deploymentNoOptionalIncluded
SupportBusiness hours24/724/7 + named engineer
Indicative price$20,000/mo$130,000/mo$900k to $12M ACV
ROI

The arithmetic a concentrator runs

We do not publish savings percentages because we have not measured any yet. These are the inputs a plant brings to the pilot baseline, and the outputs the pilot measures.

Inputs you already have

  • Recovery and concentrate grade per shift and per lot, from assays
  • Energy per tonne on the grinding circuit
  • Reagent consumption per tonne by reagent
  • Water per tonne and water recovered from thickeners
  • Throughput and circuit upsets per month
  • Off-spec concentrate and penalty events

What the pilot measures

  • Grade and recovery prediction and froth-condition accuracy against assay and the metallurgist baseline on the wedge workflow
  • Recovery improvement
  • Energy, water and reagent reduction
  • Throughput and circuit-stability improvement
  • A hard ROI metric tied to the Circuit price and the value of a recovery point
  • Conversion of the design partner to paid
Run timeline · scenario

What you are actually buying

A run engine that produces this record on every shift, on every circuit you license.

run_4b9e27 Line 1 · SAG and ball circuit, rougher bank 2 · copper porphyry blend illustrative scenario SUCCEEDED
  1. 01 ingest.shift SUCCEEDED 0.7 s

    Concentrator Orchestrator · Pulled the shift plan from the concentrator MES: copper porphyry blend B-14, P80 target 150 µm, concentrate grade at or above 25% Cu, recovery target per the geometallurgy model, energy and water budgets. Locked the operating envelope for the blend.

  2. 02 twin.simulate SUCCEEDED 58 s

    Concentrator Twin · Simulated 32 candidate grind, air and reagent schemes on the as-run twin for the hardening blend, ranked on predicted recovery, concentrate grade, kWh per tonne and water per tonne. Two candidates breached the thickener bed limit and were discarded.

  3. 03 grind.setpoint SUCCEEDED 3 m 40 s

    Crush-and-Grind · SAG-1 feed trimmed 3% and cyclone water raised as load and power signatures read a harder feed. P80 from the particle-size analyzer held at 148 µm against the 150 µm target; mill power stayed inside the energy budget.

  4. 04 froth.read SUCCEEDED continuous

    Grade-and-Froth · Twelve froth cameras and the online XRF on rougher bank 2 fused at the edge. Froth stability on cells 3 and 4 fell as the blend hardened; predicted recovery drifted 0.4 points below plan. Early warning published to the control agents.

  5. 05 approve.human APPROVAL 1 m 12 s

    Concentrator Orchestrator · Scheme #7 raises collector dose 6% on rougher bank 2, above the standing reagent scheme. Reagent-scheme changes stay supervised on this blend, so the step was held for the shift metallurgist and approved at 07:19:44.

  6. 06 float.dose SUCCEEDED 2 m 05 s

    Float-and-Reagent · Approved collector dose applied with an air trim of 4% down on cells 3 and 4 inside the envelope. Froth stability recovered within eight minutes; predicted recovery returned to plan with concentrate grade read at 25.6% Cu.

  7. 07 classify.cyclone SUCCEEDED 42 s

    Separate-and-Classify · One cyclone brought online in cluster 1 as feed density rose with the hardness change, holding overflow size and circulating load inside the plan.

  8. 08 dewater.thickener SUCCEEDED continuous

    Thicken-and-Dewater · Tailings thickener TH-2 flocculant dose trimmed as bed pressure rose; underflow density held and overflow clarity stayed inside the water-recovery target.

  9. 09 optimise.targets SUCCEEDED 18 s

    Throughput-and-Recovery · Whole-plant targets recomputed for the hardened blend: feed rate, P80, air and reagent targets handed to the control agents with recovery, grade, energy and water inside the budget. The losing candidates and their scores are in the run record.

  10. 10 lot.release SUCCEEDED 1 m 30 s

    Quality-and-Conformance · Concentrate lot C-20931 released: genealogy written (blend, grind record, reagent and air moves, froth and grade reads, approvals, dewatering record, assays as they land) and dispositioned against the concentrate spec with cited evidence for the metallurgist's sign-off.

Commodities

Which plan fits

Copper, gold, lithium, nickel and zinc, iron ore and rare earths. Most plants pick one circuit and one wedge, prove the number, then expand.

CopperBeachhead, high throughput

Copper

Porphyry copper concentrators with instrumented SAG and ball circuits and rougher banks. Frothix and Floatex on the rougher bank where a recovery point is already counted in metal.

GoldRecovery value

Gold

Gold flotation and gravity circuits where a recovery point is worth the most per tonne. Frothix on the flotation bank first, Grindex on the mill as the energy case lands.

LithiumNew plants, new ore

Lithium

Spodumene concentrators ramping on variable feed. Oretwin to rehearse blends and schemes before the shift, Floatex on reagent control.

Nickel and zincReagent and grade

Nickel and zinc

Sulphide flotation with tight concentrate specifications and depressant chemistry. Floatex and Frothix on the cleaner bank with the metallurgist's approval gates.

Iron ore and rare earthsEnergy and separation

Iron ore and rare earths

Grinding, classification and magnetic or gravity separation where energy per tonne dominates. Grindex first, then the classification and dewatering agents in the Concentrator tier.

Guardrails

An agent that can move a reagent pump needs a leash

Orebex writes to production equipment. Every capability is scoped, every write is policy-checked against the operating envelope, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits and the operating envelope for the blend.
  • Policy engine before every write. Autonomy level, shift, ore type, interlock state, water and tailings constraints and metallurgist policy are evaluated before a setpoint moves.
  • Human-in-the-loop gates. Reagent-scheme changes and lot release wait for a named approver. Robotics stays assistive until the site safety case is proven.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the envelope applied, confidence, estimated recovery, grade, energy, water and reagent impact, rollback path, approver and lot scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the APC or DCS last known-good state. Interlocks are never in Orebex's path, and the edge runs fail-safe through a network outage.
  • Tenant and ore-body isolation. Ore-body data, geometallurgy models, reagent schemes and recovery records never cross a customer boundary. On-prem and edge deployment is available for remote sites.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Environmental and water assurance packagesRecovery, energy, water and tailings evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningISO, ICMM, tailings and water governance documents RUNNING In the design, every answer cites its source
Per-tenant and ore-body isolationOre data, schemes, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRemote and IP-sensitive sites RUNNING Design option

Read the security overview

Enterprise

Standardise autonomy across the group

One policy model, one audit trail, one benchmark across every circuit in every concentrator, with the ore, mineralogy and recovery models kept private to each site.

Talk to us Enterprise details

  • SSO and role-based access down to the tag level, planned for the 6 to 12 month release
  • Group-wide autonomy policy with per-site override and approval chains
  • Cross-plant benchmarking on recovery, grade, energy, water and reagents
  • On-prem and plant-edge deployment for remote and IP-sensitive sites
  • Edge autonomy that survives control-plane loss by returning to the DCS last known-good state
  • Dedicated deployment engineer and quarterly model review per concentrator
FAQ

Straight answers

The questions processing managers, metallurgists and sustainability leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the operating envelope for the blend, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Orebex writes nothing. Reagent-scheme changes stay supervised by a named metallurgist until the ore type is characterised.

Get started

Start with one circuit

Start with one grinding or flotation circuit and one measurable baseline. A paid pilot on froth-vision recovery control, grind-size energy or reagent dosing shows the number before you commit further.