Careers

Work on software that moves a reagent pump and a mill setpoint.

Orebex is pre-launch and building its founding team. The four roles below are the ones we expect to open first, written as honestly as we can about the stage: there is no office to show, no customer list, and the first job is a paid pilot on one circuit.

4 founding rolesPre-launchEdge, OT, simulation, metallurgy

run_4b9e27 · agent graph · line 1 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.shift ✓ SUCCEEDED 02 · oretwin twin.simulate ✓ SUCCEEDED 03 · crush_grind grind.setpoint ✓ SUCCEEDED 04 · grade_froth froth.read ✓ SUCCEEDED 05 · orchestrator approve.human ◆ APPROVAL 06 · float_reagent float.dose ✓ SUCCEEDED 07 · separate_classify classify.cyclone ✓ SUCCEEDED 08 · thicken_dewater dewater.thickener ✓ SUCCEEDED 09 · throughput_recovery optimise.targets ✓ SUCCEEDED 10 · quality_conf lot.release ✓ SUCCEEDED

Illustrative scenario: Line 1 · SAG and ball circuit, rougher bank 2 · copper porphyry blend, one shift, one approval gate

Founding roles

Where we need people

Role descriptions, not an openings count. Each is a founding role.

Founding role · 01

Founding edge perception engineer

Jetson Orin, DeepStream, Holoscan, TensorRT. Fuse froth cameras, online analyzers and particle-size sensors into one live read of grade, recovery and froth condition at the bank.

Founding role · 02

Founding controls and OT integration engineer

Mill, flotation APC, DCS, reagent-dosing, dewatering and robot connectors. Guarded writes, interlocks, rollback and the audit log.

Founding role · 03

Founding simulation engineer

Omniverse concentrator twin, comminution and DEM, flotation and geometallurgy simulation, physics-informed surrogates with Modulus, cuOpt optimisation.

Founding role · 04

Founding metallurgist

Someone who has run a flotation or comminution circuit. Translate metallurgist craft into operating envelopes, reagent-scheme policy, metrics and acceptance tests for design partners.

How we work

Six things about working here

01

The plant is the customer

We measure ourselves on recovery points, kilowatt-hours per tonne, reagent per tonne and water per tonne, the plant's own numbers.

02

Nothing unlabelled

A design target is called a design target. A scenario is called a scenario. We do not round up.

03

Safety is a feature

The policy engine, approvals, interlocks and the audit log are the product, not overhead.

04

Simulate first

A move is rehearsed on the twin before it is written. So are our own changes.

05

Write it down

Every decision, every run, every correction goes into a record someone else can read.

06

Go to the plant

The craft we are encoding lives in the control room and on the flotation floor, often a long way from anywhere. We go there.

Run timeline · scenario

What you would be building

Every Orebex run is an ordered, inspectable sequence. This is run_4b9e27 on Line 1 · SAG and ball circuit, rougher bank 2 · copper porphyry blend. Scenario completes in 10 steps with one approval gate. P80 held at 148 µm as the blend hardened, froth stability recovered on rougher bank 2 after an air trim, a collector-dose change was approved by the shift metallurgist, predicted recovery held inside the plan, lot C-20931 released with full genealogy.

run_4b9e27 Line 1 · SAG and ball circuit, rougher bank 2 · copper porphyry blend illustrative scenario SUCCEEDED
  1. 01 ingest.shift SUCCEEDED 0.7 s

    Concentrator Orchestrator · Pulled the shift plan from the concentrator MES: copper porphyry blend B-14, P80 target 150 µm, concentrate grade at or above 25% Cu, recovery target per the geometallurgy model, energy and water budgets. Locked the operating envelope for the blend.

  2. 02 twin.simulate SUCCEEDED 58 s

    Concentrator Twin · Simulated 32 candidate grind, air and reagent schemes on the as-run twin for the hardening blend, ranked on predicted recovery, concentrate grade, kWh per tonne and water per tonne. Two candidates breached the thickener bed limit and were discarded.

  3. 03 grind.setpoint SUCCEEDED 3 m 40 s

    Crush-and-Grind · SAG-1 feed trimmed 3% and cyclone water raised as load and power signatures read a harder feed. P80 from the particle-size analyzer held at 148 µm against the 150 µm target; mill power stayed inside the energy budget.

  4. 04 froth.read SUCCEEDED continuous

    Grade-and-Froth · Twelve froth cameras and the online XRF on rougher bank 2 fused at the edge. Froth stability on cells 3 and 4 fell as the blend hardened; predicted recovery drifted 0.4 points below plan. Early warning published to the control agents.

  5. 05 approve.human APPROVAL 1 m 12 s

    Concentrator Orchestrator · Scheme #7 raises collector dose 6% on rougher bank 2, above the standing reagent scheme. Reagent-scheme changes stay supervised on this blend, so the step was held for the shift metallurgist and approved at 07:19:44.

  6. 06 float.dose SUCCEEDED 2 m 05 s

    Float-and-Reagent · Approved collector dose applied with an air trim of 4% down on cells 3 and 4 inside the envelope. Froth stability recovered within eight minutes; predicted recovery returned to plan with concentrate grade read at 25.6% Cu.

  7. 07 classify.cyclone SUCCEEDED 42 s

    Separate-and-Classify · One cyclone brought online in cluster 1 as feed density rose with the hardness change, holding overflow size and circulating load inside the plan.

  8. 08 dewater.thickener SUCCEEDED continuous

    Thicken-and-Dewater · Tailings thickener TH-2 flocculant dose trimmed as bed pressure rose; underflow density held and overflow clarity stayed inside the water-recovery target.

  9. 09 optimise.targets SUCCEEDED 18 s

    Throughput-and-Recovery · Whole-plant targets recomputed for the hardened blend: feed rate, P80, air and reagent targets handed to the control agents with recovery, grade, energy and water inside the budget. The losing candidates and their scores are in the run record.

  10. 10 lot.release SUCCEEDED 1 m 30 s

    Quality-and-Conformance · Concentrate lot C-20931 released: genealogy written (blend, grind record, reagent and air moves, froth and grade reads, approvals, dewatering record, assays as they land) and dispositioned against the concentrate spec with cited evidence for the metallurgist's sign-off.

Process

How hiring runs

  1. Write to us. What you would own, what you have built or run, and why the concentrator.
  2. A conversation. An hour on the problem, not a quiz.
  3. A working session. A real design question from the backlog, worked together.
  4. References and an offer. Founding terms, discussed openly.
Accelerated computing

Physical AI, at the bank and the mill

Froth changes in seconds and a shift of feed is gone before the assay lands. Perception has to be local, deterministic and fast, so Orebex runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

8 to 24 froth cameras per bank at 15 to 30 FPS plus online XRF, particle-size, pump, level, air, reagent, density and energy streams fused at the plant edge. Sub-250 ms froth inference and local fail-safe through a network outage are the design targets. Jetson Thor is planned.

Triton · NIM

Model serving

Froth, particle and mineralogy, recovery prediction, time-series anomaly and metallurgy retrieval models behind one orchestrator at the plant edge, 20 to 60 per site as a design target, with versioned canaries and rollback.

DGX or HGX · NeMo

Training

Froth segmentation, bubble velocity and stability, grade and recovery prediction, ore hardness, grind-size response, reagent response and metallurgy assistants trained on froth video, analyzer readings, telemetry and metallurgist corrections. 2,000 to 8,000 GPU-hours per commodity model family is the design target once partner data exists.

Omniverse · OVX

Concentrator twin

Grinding, flotation, classification and dewatering simulated as-run against as-designed before the shift. GPU comminution and DEM, flotation and geometallurgy simulation is the workload; physics-informed surrogates with Modulus are planned so schemes rank at production cadence.

Cosmos · Omniverse Replicator

Synthetic data

Rare froth-collapse, feed-upset, mineralogy-shift, equipment-drift and camera-fouling cases generated and validated against real assay distributions before promotion. 50k to 250k scenarios per commodity and circuit class is the design target.

cuOpt

Optimisation

Throughput, energy, water and reagent allocation and the grade and recovery trade-off solved before the shift and during upset recovery, and handed to the control agents as targets.

Isaac Sim · Isaac ROS

Robot sampling and handling

Sampling routes, reagent tote inspection and inspection rovers trained and validated in simulation before they run on site. Assistive until the safety case is proven.

RAPIDS

GPU ETL

Daily features from froth, analyzer, mill, flotation, dewatering and genealogy telemetry for retraining, drift detection and recovery, energy, water and reagent benchmarks.

Autonomy

Four levels, set per agent and per tag

A concentrator does not go from manual to unattended in one step. Orebex makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then bounded autonomy on low-risk grinding and flotation loops. Reagent-scheme changes stay supervised until the ore type is characterised.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · ShadowReads froth, analyzer, particle, mill, flotation, dewatering, robot and MES signals; predicts and recommends; writes nothingRuns the circuit as today; compares predictions to assays and metallurgist outcomesShadow mode, baseline measured first
L2 · AssistProposes grind, reagent, air, froth and dewatering moves with evidence, confidence, envelope and rollback pathApproves each action in the review consoleAssist mode, the remainder of a 90 to 120 day pilot
L3 · BoundedExecutes pre-approved low-risk grinding and flotation loop moves: feed, water, air, level, flocculant, cyclones online, inside APC, DCS and envelope limitsApproves reagent-scheme changes and lot releaseGraduated autonomy, after audited accuracy and ROI
L4 · Constrained auto-controlSupervised reagent-scheme adaptation for characterised ore types, across circuits and sitesSets the envelope; reviews the shift record and the evaluation resultsPlanned; after golden-dataset evaluation, twin validation and metallurgist sign-off
Guardrails

An agent that can move a reagent pump needs a leash

Orebex writes to production equipment. Every capability is scoped, every write is policy-checked against the operating envelope, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits and the operating envelope for the blend.
  • Policy engine before every write. Autonomy level, shift, ore type, interlock state, water and tailings constraints and metallurgist policy are evaluated before a setpoint moves.
  • Human-in-the-loop gates. Reagent-scheme changes and lot release wait for a named approver. Robotics stays assistive until the site safety case is proven.
  • Immutable audit log. Append-only and exportable. Every action records source evidence, the envelope applied, confidence, estimated recovery, grade, energy, water and reagent impact, rollback path, approver and lot scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the APC or DCS last known-good state. Interlocks are never in Orebex's path, and the edge runs fail-safe through a network outage.
  • Tenant and ore-body isolation. Ore-body data, geometallurgy models, reagent schemes and recovery records never cross a customer boundary. On-prem and edge deployment is available for remote sites.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Environmental and water assurance packagesRecovery, energy, water and tailings evidence QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningISO, ICMM, tailings and water governance documents RUNNING In the design, every answer cites its source
Per-tenant and ore-body isolationOre data, schemes, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentRemote and IP-sensitive sites RUNNING Design option

Read the security overview

FAQ

Straight answers

The questions processing managers, metallurgists and sustainability leads ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, inside the operating envelope for the blend, and only at the autonomy level your plant has set. Design partners start in shadow mode, where Orebex writes nothing. Reagent-scheme changes stay supervised by a named metallurgist until the ore type is characterised.

Get started

Tell us what you want to own

Write to hello@orebex.com with the role and what you have built.